Updated December 31, 2004
AMBOS NOGALES GENERATING STATION
A HISTORY OF THE MAESTROS GROUP EFFORT
Five years ago a group of concerned citizens in Santa Cruz County, Arizona
banded together to try and promote a positive and integrated solution to water
and energy problems facing the border region of Arizona and Sonora. Those problems included: --Energy demand for Santa Cruz County and its major population center
Nogales, Arizona was projected to exceed existing local generation and outside
transmission capacity in a few years. In addition, due to the single radial transmission line
serving the area, power outages were common. In response to this situation
Tucson Electric Power (TEP) proposed a new 345 kv transmission line from Tucson
to Nogales, with about 100 MW of the capacity allocated to Nogales, and 400 MW
of capacity allocated to providing interconnected energy flow between the United
States and Mexico. --The proposed TEP power line ignited a firestorm of controversy throughout
the Santa Cruz Valley as proposed alignments of the line either negatively
impacted proposed wilderness areas, or the significant riparian and historic areas
within the Santa Cruz River valley itself. --The government of Mexico had initiated a program to issue 25 year Power
Purchase Agreements (PPAs) to Independent Power Producers (IPPs) to attract
energy companies from outside of Mexico to build new power plants inside Mexico
to serve that country's growing energy demands. These 25 year PPAs are issued
under a competitive bidding process. The government-owned electric utility of
Mexico, the Comision Federal Electricidad (CFE) was tendering a bid called
"Naco-Nogales" for approximately 250 MW of new generation, with this
new power plant to be located either in Nogales, Sonora, or Naco, Sonora. --Nogales, Sonora did not have any natural gas supply via pipeline. The
existing natural gas pipeline serving Nogales, Arizona only had about 7.5
million cubic feet per day of delivery capacity. The gas supply for Nogales, Arizona was
insufficient to serve the residential, commercial and industrial needs of the
Arizona city, let alone fuel the 48 MW of local generation available within the
city for emergency demands when the transmission line failed. --Wastewater from Nogales, Sonora (which has a population estimated at
350,000 people) is treated at the Nogales International Wastewater Treatment
Plant (NIWTP) in Nogales, Arizona. The NIWTP also treats wastewater from
Nogales, Arizona (population 22,000). The existing treatment plant has a
capacity of 17.2 million gallons per day, of which 9.9 mgd is allocated to
Mexico and 7.3 mgd is allocated to the Arizona needs. Wastewater flows from
Mexico routinely exceed the 9.9 mgd allocation for Mexico, the pipeline carrying
the Mexican wastewater to the NIWTP is badly in need of rehabilitation as it
absorbs over 3 mgd of inflow and infiltration, and the treatment plant capacity
is essentially all consumed. New US federal and state water quality standards
dictate that the NIWTP must be upgraded to meet the more stringent environmental
standards. Mexican governmental officials are less than enthusiastic about
paying the capital costs to upgrade this treatment plant or to pay higher
operating costs, as all the treated wastewater from Mexico ends up in the Santa
Cruz River, which flows north into the interior of Arizona. The treated effluent
sustains a significant riparian area and a population of endangered species of
fish. The concerned Santa Cruz County residents banded together and created the Maestros
Group and formulated a comprehensive solution to the five challenges facing
the region. The initial issue was...if someone (TEP) wanted to sell 400MW of energy to
Mexico via a transmission line, and if Mexico was putting out bids for new power
plants to serve Mexican energy demand, why couldn't those Mexican demands be met
from a power plant located in Nogales, Arizona? Simply put--why not a power plant in Nogales, Arizona? Maestros Group formulated a proposal for a power plant in Nogales, Arizona
to provide energy to Mexico and to Santa Cruz County. Click here for the
updated Maestros Group Proposal. In order for the Maestros Group proposal to work, we needed the following: --a new natural gas pipeline to provide at least 80 million cubic feet per
day of gas supply --cooling water --a site --a Presidential Permit --financing to build the power plant --someone to operate the power plant. We then set out to see if all the pieces could be assembled. The result was yes they could. El Paso Natural Gas (EPNG) company expressed interest in building a new
pipeline from Tucson to Nogales--provided there was a customer demand large
enough to justify the pipeline. EPNG in fact built a new pipeline from Wilcox to
Douglas, Arizona and across the Mexican border to serve a power plant in Agua
Prieta, Mexico. Thus there was precedent for the gas supply to emerge. Maestros Group proposed utilizing 3 million gallons per day of treated
wastewater from the NIWTP for cooling water for the power plant, now called the
Ambos Nogales Generating Station (ANGS), and had the feasibility of this
verified. Maestros Group identified at least 3 viable sites upon which a large power
plant could be constructed. Maestros Group applied for a Presidential Permit. Maestros Group obtained a Financial Advisor who has guided the effort through
preliminary due diligence. And Maestros Group entered into confidential agreements with equipment
suppliers and operating entities, the combination of which provided the
capability to construct and operate a power plant. In the course of this effort, Maestros Group established a set of criteriaa>
to guide the development of this project. The criteria were essential to
protecting both the economic and environmental benefits being sought by this
effort. Click here to see the criteria. Simultaneously, the Mexican government repeatedly delayed the formal
announcement of its 25 year PPA bid for 400+ MW called "Agua Prieta
II". Thus, the stage had been set for a bid to originate from Nogales to the
Mexican government based on a power plant in Nogales, Arizona. Through extensive contact with the Mexican government, Maestros Group was
ultimately advised in January 2004 that under no circumstances would Mexico
entertain a 25 year bid from a power plant on the US side of the border. The Mexican government also made it clear that any wastewater treatment
facility providing cooling water for the power plant had to be located within
the fence of the power plant and be an integral part of the power plant. Thus,
use of any treated wastewater from the NIWTP was ruled out. However, the Mexican government also suggested that as an alternative,
Maestros Group could consider a "self supply" project whereby instead
of selling energy direct to CFE, the power plant could sell direct to state and
local governments in Mexico and to private industries, with CFE providing the
wheeling. Maestros Group then pursued the "self supply" alternative to the
point of proving that alternative was also viable. As part of this effort, Maestros identified a power plant site in Nogales,
Sonora, and verified the feasibility of constructing an advanced wastewater
treatment plant adjacent to the proposed power plant. This treatment plant would
not only provide cooling water for power generation, it would also provide
potable water supplies to Nogales, Sonora. The cooling water would be derived
from wastewater generated in Nogales, Sonora in excess of the 9.9 mgd treaty
limit--thus solving the problem of excess flows into Arizona and providing
funding for treatment of the excess flows (by selling the treated water to the
power plant) such that Nogales, Sonora would not be burdened with the capital
cost for the wastewater treatment. Maestros Group also had extensive discussions with potential customers in
Sonora to verify that a "self supply" project was feasible. And it is.
_______________ WHERE ARE WE NOW? 2005 The
Mexican government dropped any effort to seek a power purchase bid from a source in Nogales in 2005,
thus ending the Maestros Group's efforts to organize a bid consortium.
Maestros Group L.L.C. is an Arizona limited liability company formed for
the purpose of promoting socially and environmentally responsible economic
development along the US-Mexico border.